Most of what goes wrong with an office furniture package happens between the drawing and the dock. We hold the whole line, from space planning through installation, so nothing falls between trades in a New York building.
Asset management
Full inventory of existing furniture, condition reporting and disposition planning, so you know exactly what you have before you spec anything new.
Space planning
Test fits, blocking and stacking, and typicals worked against your real headcount rather than a catalogue layout. We produce drawings that actually reflect how the floor will be used, then carry the same set through specification.
Specification
Full specification with finishes, fabric and power paths, issued in SIF so it drops cleanly into the order. If your architect has already specified a product, we will quote it as drawn.
Delivery and installation
Scheduled receiving, crews to suit the building, and a walked punch list at the end. Dock times, freight elevators and after hours windows are ours to hold, not yours.
Moves, adds and changes
Reconfigurations, added stations and warranty work after occupancy, handled as one ongoing relationship by the same people who specified the job.
Specified to the brief, not to one catalogue.
We work across manufacturers instead of pushing a single line, so the specification answers the budget, the lead time and the building.
We hold the line card open on purpose. Tell us the brief and the relevant lines are in your inbox the same day.
Send us the plan. We will send back a real number.
A floor plan and a headcount is enough to begin.
